Home → BIM
Category
ENQUIRY FORM

BIM FOR INFRASTRUCTURE

BIM FOR MANAGER
BIM for managers is for those wanting to manage the entire BIM interface for their clients. They will be a reliable support system and handle queries related to BIM.
Advantages of BIM for Manager are:
- It helps in understanding BIM processes and exploring new collaborations.
- It helps in opting latest infrastructure technologies
- It helps in innovation and accelerating processes
Key Benefits of BIM for Managers
- Improved Collaboration: BIM facilitates real-time collaboration between architects,
engineers, contractors, and owners. The model is accessible by all stakeholders, which
helps avoid errors, omissions, and miscommunications. - Increased Efficiency: By using BIM, teams can detect clashes (e.g., where ductwork and
plumbing might interfere), reducing rework and saving time and costs. - Better Decision Making: Managers can analyze the impact of different design choices
and make more informed decisions, leading to better outcomes and less risk. - Cost Control and Scheduling: With BIM’s ability to provide accurate material
quantities, managers can better estimate costs and track project schedules, ensuring
deadlines are met. - Asset Management and Facility Management: BIM can extend beyond construction
and be used for ongoing maintenance and management of the building throughout its
lifecycle.

BIM FOR COORDINATOR
A coordinator is a mediator between various responsible sections or departments working on a project. They manage different tasks on a priority basis to ensure smooth operations.
Advantages of BIM for Coordinator are:
- It helps in decision-making related to design, construction and building management
- It helps in timely sharing information within different teams working on a particular project
- It helps in making an error-free successful construction
Key Responsibilities of a BIM Coordinator:
- Model Management: Ensure proper development and maintenance of 3D models (architectural, structural, MEP, etc.) across various disciplines. This includes updating
models regularly and ensuring they meet project specifications. - Collaboration and Coordination: Facilitate effective communication between different
project teams (architects, engineers, contractors, subcontractors) to avoid clashes and errors in the digital model. - Quality Control: Review models for quality assurance, checking for clashes,
inconsistencies, and errors, and ensuring adherence to BIM standards and guidelines. - BIM Standards Compliance: Implement and monitor compliance with BIM standards,
guidelines, and protocols (such as ISO 19650, or other national/international standards),
ensuring consistency across the project. - Clash Detection: Use specialized software (like Navisworks, Solibri, or BIM 360) to
identify clashes or conflicts between different building systems and components, and
work with the team to resolve them. - Documentation and Reporting: Keep detailed records of the BIM process, including
model versions, clash detections, and updates. Provide regular reports on model progress,
issues, and solutions.

BIM FOR ARCHITECTS
An architect’s love for BIM is backed by its ability to help him design every component of a building, highway, and bridge in 3D.
Advantages of BIM for Architects are:
- It helps in experimenting with the current designs to foresee the design of future
- It helps in improving the construction process and quality
- It helps in constructing long-lasting infrastructures
Key Benefits of BIM for Architects
- BIM allows architects to create 3D models of their designs, which helps clients and stakeholders to better understand the spatial relationships, design intent, and over all aesthetics of a project before construction begins.
- Coordination with other disciplines (structural, MEP, etc.) is made easier, reducing conflicts and errors during construction.
- This data-centric approach helps with optimizing designs, improving building performance, and minimizing resource waste.
- BIM allows for “clash detection,” identifying potential conflicts between different systems, such as structural elements and HVAC systems, before construction begins. This helps to prevent costly and time-consuming changes during the construction phase.
- BIM tools integrate with environmental performance software, enabling architects to simulate and analyze energy consumption, daylight, airflow, and other factors that influence a building’s sustainability.

BIM FOR MECHANICAL
Material management and production planning are the two most crucial sections. BIM for Mechanical, with its different fields, plays a significant role in complementing their existing manufacturing, production and design knowledge.
Advantages of BIM for Mechanical are:
- It helps in effective communication between different teams working onsite
- It helps in minimising wastage and improves profit margins as a result
- It helps new joiners to adapt fast to the project aims and processes
Key Benefits of BIM for Mechanical Systems:
- BIM allows for 3D modeling of HVAC (heating, ventilation, and air conditioning) systems, ductwork, piping, and other mechanical elements. This ensures better coordination between disciplines and reduces errors in design.
- BIM promotes teamwork among architects, engineers, contractors, and subcontractors. Since all stakeholders work on a shared model, changes are reflected in real-time, reducing misunderstandings and coordination issues.
- One of the most significant advantages of BIM for mechanical systems is clash detection. Conflicts between mechanical, electrical, and plumbing systems (e.g., ductwork crossing over plumbing lines) can be identified and resolved during the design phase, preventing costly mistakes during construction.
- BIM allows for automatic generation of material quantities and construction schedules. This provides more accurate cost estimations, procurement plans, and scheduling, which can lead to significant time and cost savings.
- Mechanical systems are crucial to a building’s energy performance. With BIM, you can simulate the operation of HVAC systems, assess energy efficiency, and ensure that mechanical systems are optimized for sustainability.
- After construction, the BIM model can continue to be used for facility management and maintenance. Mechanical systems’ operation, performance, and repair history can be tracked and managed throughout the building’s lifecycle.

BIM FOR MEP
MEP stands for Mechanical, Electrical and Plumbing. BIM for MEP intends to manage all three disciplines combined while modelling a building in a 3D design.
Advantages of BIM for MEP are:
- It helps in minimising risk related to the project
- It helps in evolving sustainable construction methods and building designs
- It facilitates effective communication between different teams of the project
Key Benefits of BIM for MEP
- Improved Collaboration: BIM allows MEP engineers, architects, structural engineers,
and contractors to work from a shared 3D model, ensuring alignment across all systems
and disciplines. This can significantly reduce conflicts during construction. - Clash Detection: One of the main benefits of BIM for MEP is its ability to perform
automatic clash detection. This identifies potential conflicts between MEP systems and
other building elements (e.g., ducts clashing with structural beams), which can be
resolved early in the design process before construction begins. - Better Visualization: BIM provides 3D models that allow stakeholders to visualize
how MEP systems fit into the overall building design. This improves understanding and
helps prevent costly design changes later in the project. - Enhanced Accuracy: BIM allows for precise measurements and placement of MEP
systems, reducing errors and rework in the field. The 3D model can be checked for
correct routing, sizing, and alignment before any physical work begins. - Improved Cost and Schedule Management: With BIM, MEP contractors can more
accurately estimate material quantities, labor costs, and project schedules. The model
can also be updated in real-time to reflect changes, keeping project timelines and
budgets on track.

BIM FOR INTERIOR
The course enables you to be aware of designing the interior objects’ size, parameters, and design to build harmony with different building spaces.
Advantages of BIM for Interior are:
- It facilitates planning with 3D visualisation
- It provides updated information to lead the project better
- It helps in improved productivity and advanced construction
Key Benefits of BIM in Interior Design:
- BIM allows designers, architects, engineers, and contractors to work from a single model, ensuring that everyone is on the same page. This collaborative environment helps to identify potential conflicts early, such as spatial clashes between structural elements and interior features.
- BIM provides 3D modeling capabilities, which help interior designers and clients visualize spaces before construction begins. This allows designers to better communicate their ideas, and clients can provide feedback in real-time, reducing misunderstandings.
- BIM stores detailed data about the components used in the interior design, such as materials, finishes, lighting, and furniture. This data can be used for quantity takeoffs, scheduling, and budgeting, providing accurate cost estimates and material lists.
- The ability to detect and address design errors or inconsistencies early in the process can save time and money during construction. BIM helps in reducing rework, delays, and unexpected costs by improving the design process upfront.
- BIM can incorporate sustainability features like energy modeling, allowing interior designers to assess the energy efficiency of materials and lighting systems. This is especially important as demand for green building certifications (e.g., LEED) increases.

BIM EXECUTION PLAN
BIM Execution Plan (BEP) program involves information related to project objectives, responsible persons’ contacts, roles, project stage, level of development, model elements, software in use, etc.
Advantages of BIM Execution Plan are :
- It intends to provide enough information to plan the project in advance
- It facilitates collaborative processes and data-sharing tasks
- It saves time and cost
Key Elements of a BIM Execution Plan
- Clarification of the specific BIM uses (e.g., design coordination, clash detection, 3D modeling, scheduling, cost estimation, etc.).
- Description of how BIM will be utilized at various stages of the project.
- Definition of the standards for the creation and exchange of BIM data, including naming conventions, file formats, and level of detail (LOD).
- Identification of the software and tools to be used (e.g., Revit, Navisworks, BIM 360, etc.).
- Guidelines for ensuring that different software tools can work together seamlessly and handle data exchange appropriately.
- Guidelines on how team members will collaborate using BIM tools (e.g., cloud-based platforms, shared models).
- Define the frequency of meetings, review processes, and communication channels for sharing information and resolving issues.
- Guidelines for storing and managing BIM data (e.g., central repositories, cloud-based systems).
- Instructions for version control to track changes and maintain the integrity of the model.
- Standards for how data will be exchanged between different parties, ensuring data consistency and accuracy.

BIM 360 - Design & Docs
It solves the major challenge most firms face regarding solid communication, sharing and managing information related to project design and its implementation to ensure better results.
Advantages of BIM 360 – Design & Docs are:
- It helps in productivity improvement and cost reduction
- It minimises the time taken for project completion
- It minimises project errors through information sharing effectively
Key Benefits of BIM 360 Design & Docs
- Improved Collaboration: The cloud-based platform enables seamless collaboration between various teams (designers, architects, engineers, contractors) from different locations.
- Increased Efficiency: By storing all documents and models in a central location, teams can quickly find and access information, reducing time spent searching for files and ensuring that the latest versions are always available.
- Risk Reduction: With version control and real-time updates, the risk of errors caused by outdated documents is minimized.
- Enhanced Communication: Integrated communication tools help facilitate clear and effective exchanges between team members, reducing misunderstandings and delays.

BIM SITE COORDINATION
To achieve desired infrastructure or construction management goals, BIM site coordination involves a project’s responsible faculties and forecasts any upcoming challenge to deal with it better.
Advantages of BIM Site Coordination are:
- It facilitates coordination and communication effectively
- It ensures time management and project efficiency
- It prevents errors and saves time and efforts
Benefits of BIM Site Coordination
- Reduced Errors and Rework: By identifying clashes early, contractors can address potential issues before they become costly problems on-site.
- Improved Collaboration: All stakeholders have access to the same model, improving communication and minimizing misunderstandings.
- Increased Efficiency: The construction process becomes more streamlined, reducing time spent on manual processes and correcting mistakes.
- Better Resource Management: BIM allows for better scheduling and allocation of resources, reducing waste and ensuring that materials and labor are efficiently used.
- Cost Control: Accurate tracking of materials and progress helps avoid budget overruns and delays.
- Enhanced Quality: With all disciplines working from a single coordinated model, the final build quality is often higher due to fewer issues during construction.

BIM FOR ELECTRICAL
BIM for Electrical intends to help the user by empowering him with software to control and manage the electrical systems and supply in a building with utmost safety.
Advantages of BIM for Electrical are :
- It helps in reducing hazardous safety situations related to the onsite project
- It enables better operations and maintenance management
- It enables visualising the entire construction in 3D to facilitate electrical tasks
Benefits of BIM for Electrical
- Improved accuracy and quality: Less chance of human error, as the electrical systems
are designed and coordinated digitally. - Better planning: Visualizing electrical systems in 3D can help identify challenges before
construction begins, reducing delays and unexpected costs. - Time savings: By automating tasks like calculations, system coordination, and
generating material lists, BIM speeds up the electrical design process. - Sustainability: BIM helps in designing energy-efficient electrical systems by simulating
and analyzing performance. - Streamlined operations: Easier communication between project teams reduces
misunderstandings, leading to fewer errors during construction